Traffic Notices
Traffic Advice
Temporary Traffic and Transport Arrangements on Dai Cheong Street, Tai Po
Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangements will be implemented on Dai Cheong Street during the periods as specified below:
(I) From 10.00 pm on 24 March 2025 to 6.00 am on 25 March 2025
(a) Lane Closure
(a) Lane Closure
The fast lane of Dai Cheong Street westbound from a point about 25 meters east of its junction with Dai Shing Street to a point about 115 meters east of the same junction will be temporarily closed.
(b) Public Transport Arrangements
Passengers may take the existing green minibus services about 25 meters east of the road closure area on Dai Cheong Street.
(a) Lane Closure
The slow lane of Dai Cheong Street westbound from a point about 25 meters east of it junction with Dai Shing Street to a point about 115 meters east of the same junction will be temporarily closed.
(b) Public Transport Arrangements
Passengers may take the existing green minibus services about 25 meters east of the road closure area on Dai Cheong Street.
Appropriate traffic signs will be erected on site to guide motorists.