Project Involving Major Road Works |
Gazettal Doc |
Progress (Stage) |
Outline Zoning Plans |
Braemar Hill Pedestrian Link
HyD e11-1.wd@hyd.gov.hk 3903-6660 |
Link |
Construction |
North Point |
Central Kowloon Route
HyD enquiry@ckr-hyd.hk 2762-3601 |
Link |
Construction |
Ho Man Tin Kai Tak Ma Tau Kok South West Kowloon Mong Kok Yau Ma Tei |
Development of Anderson Road Quarry Site
CEDD spro@arqaecom.com 9669-7120 |
Link |
Construction |
Kwun Tong (North) |
Development of ex-Cha Kwo Ling Kaolin Mine Site
CEDD enquiry@cedd.gov.hk 3842-7062 |
Link |
Construction |
Cha Kwo Ling, Yau Tong, Lei Yue Mun |
Development of Lok Ma Chau Loop – Land Decontamination and Advance Engineering Works
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Lok Ma Chau Loop San Tin |
Development of Lok Ma Chau Loop – Main Works Package 1
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Detailed Design & Construction |
Lok Ma Chau Loop San Tin |
Enhancing Connectivity near MTR Kwun Tong Station with Elevated Landscaped Pedestrian Deck
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kwun Tong (South) |
Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road
HyD e4-3.wd@hyd.gov.hk 3903-6810 |
Link |
Construction |
Kwai Chung |
Footbridge B along Tai Chung Road and Hoi Shing Road (6145TB-1)
HyD e4-1.wd@hyd.gov.hk 3903-6802 |
Link |
Detailed Design |
Tsuen Wan |
Formation, Roads and Drains in Area 54, Tuen Mun - Phase 1 Stage 2, Phase 2 Stage 4B and Stage 4C works
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link
|
Construction |
Tuen Mun |
Dualling of Hiram's Highway from Marina Cove to Sai Kung Town
HyD hh2.mw@hyd.gov.hk 5330-5232 |
Link |
Detailed Design |
Ho Chung Hebe Haven Pak Kong and Sha Kok Mei Sai Kung Town |
Hung Shui Kiu/Ha Tsuen New Development Area Advance Works Phase 2 - Site Formation and Engineering Infrastructure
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Hung Shui Kiu and Ha Tsuen |
Hung Shui Kiu/Ha Tsuen New Development Area Stage 1 Works - Site Formation and Engineering Infrastructure
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Hung Shui Kiu and Ha Tsuen |
Improvement Works at Tsuen Tsing Interchange (6087TI)
HyD e3twr.mw@hyd.gov.hk 2762-3355 |
Link |
Construction |
Tsuen Wan and Kwai Chung |
Infrastructure Works for Developments at Kwun Tong Action Area
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kwun Tong (South) |
Integrated Basement for West Kowloon Cultural District - remaining works
CEDD enquiry@cedd.gov.hk 3842-7062 |
Link |
Construction |
West Kowloon Cutural District |
Kai Tak development – infrastructure for developments at the former runway and south apron
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kai Tak |
Kai Tak development - remaining infrastructure works for developments at the former runway and south apron
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kai Tak |
Kai Tak Development - Stage 5B Infrastructure Works at the Former North Apron Area
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kai Tak |
Kwu Tung North / FanlingNorth New Development Areas (1st phase)
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kwu Tung North Fanling North |
Lift and Pedestrian Walkway System between Castle Peak Road and Kung Yip Street, Kwai Chung
HyD e9-2.wd@hyd.gov.hk 3903-6654 |
Link |
Construction |
Kwai Chung |
Lift and Pedestrian Walkway System between Lai King Hill Road and Lai Cho Road, Kwai Chung
HyD ent3-2.wd@hyd.gov.hk 3903-6909 |
Link |
Detailed Design |
Kwai Chung |
Lift and Pedestrian Walkway System between Saddle Ridge Garden and Sai Sha Road
HyD ephl2-1.wd@hyd.gov.hk 3903-6658 |
Link |
Construction |
Ma On Shan |
Pedestrian Walkway System between Hing Shing Road and Tai Wo Hau Road
HyD ek2-3.wd@hyd.gov.hk 3903-6921 |
Link |
Construction |
Kwai Chung |
Footbridge Connecting Morse Park No.3 and No.4 (6201TB)
HyD e14-1.wd@hyd.gov.hk 2762-3408 |
Link |
Construction |
Wang Tau Hom & Tung Tau |
Lift and Pedestrian Walkway System between Tai Loong Street and Wo Yi Hop Road, Kwai Chung (6203TB)
HyD pc14-2.wd@hyd.gov.hk 2762-3417 |
Link |
Construction |
Kwai Chung |
Retrofitting of Escalators for Footbridge across Castle Peak Road - Kwai Chung near MTR Tai Wo Hau Station Exit B
HyD elsps2-2.wd@hyd.gov.hk 3903-6832 |
Link |
Construction |
Tsuen Wan |
Retrofitting of Noise Barriers on Long Tin Road
HyD e2nm.mw@hyd.gov.hk 2762-3674 |
Link |
Construction |
Yuen Long |
Retrofitting of Noise Barriers on Po Lam Road North and Po Ning Road
HyD e3nm.mw@hyd.gov.hk 2762-3633 |
Link |
Construction |
Tseung Kwan O |
Retrofitting of Noise Barriers on Po Lam Road North (near King Ming Court)
HyD e3nm.mw@hyd.gov.hk 2762-3633 |
Link |
Construction |
Tseung Kwan O |
Site Formation and Associated Infrastructural Works for Development of Columbarium at Siu Ho Wan on Lantau Island
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Siu Ho Wan |
Site Formation and Associated Infrastructural Works for Development of Columbarium, Crematorium and Related Facilities at Sandy Ridge Cemetery
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Man Kam To Fu Tei Au & Sha Ling |
Site Formation and Infrastructure Works for Development at Kam Tin South, Yuen Long – Advance Works
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kam Tin South |
Site Formation and Infrastructure Works for Public Housing Development at Ka Wai Man Road and Ex-Mount Davis Cottage Area, Kennedy Town
CEDD enquiry@cedd.gov.hk 3842-7062 |
Link |
Construction |
Kennedy Town & Mount Davis |
Site formation and infrastructure works for public housing developments at Kam Tin South, Yuen Long
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Detailed Design & Construction |
Kam Tin South |
Site formation and infrastructure works for public housing developments at Long Bin
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Tong Yan San Tsuen |
Site Formation and Infrastructure Works for Public Housing Developments at Pok Fu Lam South
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Pok Fu Lam |
Site Formation and Infrastructure Works for Public Housing Developments at Tseung Kwan O
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Tseung Kwan O |
Site Formation and Infrastructure Works for Public Housing Developments at Pik Wan Road, Yau Tong
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Cha Kwo Ling, Yau Tong, Lei Yue Mun |
Site formation and infrastructure works for public housing developments at Tuen Mun Central - Phase 1
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Tuen Mun |
Site Formation and Infrastructural Works for Public Housing Development at Wang Chau, Yuen Long
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Ping Shan |
The Establishment of an Agricultural Park in Kwu Tung South (Phase 1)
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Kwu Tung South |
Trunk Road T2 and Cha Kwo Ling Tunnel
CEDD enquiry@trunkroadt2.com 6130-8155 |
Link |
Construction |
Kai Tak Cha Kwo Ling, Yau Tong, Lei Yue Mun |
Tseung Kwan O Further Development - Infrastructure Works for Tseung Kwan O Stage 1 Landfill Site
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Tseung Kwan O |
Tung Chung New Town Extension
CEDD tungchung@cedd.gov.hk 2231-4408 |
Link |
Construction |
Tung Chung Extension Area Tung Chung Town Centre Area Tung Chung Valley |
Wan Chai development phase II, engineering works
Construction enquiry@cedd.gov.hk 3842-7062 |
Link |
Construction |
Wan Chai North Central District (Extension) |
West Kowloon Reclamation – main works (remainder) – Footbridge at the junction of Sham Mong Road and Yen Chow Street West in Sham Shui Po
CEDD enquiry@cedd.gov.hk 3842-7062 |
Link |
Construction |
South West Kowloon |
Widening of Castle Peak Road - Castle Peak Bay
HyD enquiry@cprcpb.hk 6213-6108 |
Link |
Construction |
Tuen Mun |
Widening of Fuk Hang Tsuen Road (Between Castle Peak Road – Lam Tei and Fuk Hang Tsuen Lane)
HyD e6-1.wd@hyd.gov.hk 3903-6814 |
Link |
Construction |
Tuen Mun |
Widening of Western Section of Lin Ma Hang Road between Ping Yuen River and Ping Che Road
HyD e1lmh.mw@hyd.gov.hk 2762-4922 |
Link
|
Construction |
Man Kam To Ta Kwu Ling North |
Widening of Tai Po Road (Sha Tin Section)
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Sha Tin |
Yuen Long South Development Stage 1 Works and Stage 2 Works, Phase 1
CEDD enquiry@cedd.gov.hk 2158-5680 |
Link |
Construction |
Tai Tong Tong Yan San Tsuen |
Site formation and infrastructure works for public housing developments at Tuen Mun Central - Phase 2
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link
|
Construction |
Tuen Mun |
Nim Wan Road (South) (6887TH)
HyD e4db.mw@hyd.gov.hk 2762-3647 |
Link
|
Investigation |
N/A |
Improvement of Lion Rock Tunnel (6876TH)
HyD e1lrt.mw@hyd.gov.hk 3525-1486 |
Link |
Detailed Design |
Sha Tin Kowloon Tong (KPA 18) Wang Tau Hom & Tung Tau (KPA 8) |
Widening of T6 Bridge of Tate's Cairn Highway (6886TH/C)
HyD e1t6b.mw@hyd.gov.hk 2762-4981 |
Link |
Investigation |
Sha Tin |
Improvement Works at Mui Wo, phase 2 stage 2
CEDD enquiry@lantau.gov.hk 2231-4408 |
Link
|
Construction |
N/A |
Site Formation and Infrastructure Works for Public Housing Development at Choi Shun Street, Sheung Shui
CEDD enquiry@cedd.gov.hk 3468-8721 |
Link |
Construction |
Fanling / Sheung Shui |
Trunk Road T4 and Associated Works
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Detailed Design & Construction |
Sha Tin |
Site Formation and Infrastructure Works for Public Housing Development at Cha Kwo Ling Village, Kowloon East
CEDD enquiry@cedd.gov.hk 3842-7062 |
Link |
Detailed Design |
Cha Kwo Ling, Yau Tong, Lei Yue Mun |
Site Formation and Infrastructure Works for Public Housing Developments at Chak On Road South and Pak Tin Extension, Sham Shui Po
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Shek Kip Mei (KPA 4) |
Upgrading of Remaining Sections of Kam Tin Road and Lam Kam Road (6820TH)
HyD e6-5.wd@hyd.gov.hk 3903-6817 |
Link |
Detailed Design |
Kam Tin North Pat Heung Shek Kong Lam Tsuen |
Footbridge near MTR Kowloon Bay Station Exit A (6200TB)
HyD e13-2.wd@hyd.gov.hk 3903-6757 |
Link |
Construction |
Ngau Tau Kok and Kowloon Bay |
Footbridge near Former Ngau Tau Kok Police Station and Associated Road Works (6192TB)
HyD elsps1-1.wd@hyd.gov.hk 3903-6809 |
Link |
Detailed Design |
Kwun Tong |
Wah Sing Street to Castle Peak Road - Kwai Chung Escalator Link System
HyD e8-1.wd@hyd.gov.hk 3903-6818 |
Link |
Detailed Design |
Kwai Chung |
Pedestrian Link between MTR City One Station and Prince of Wales Hospital (6209TB)
HyD e15-1.wd@hyd.gov.hk 2762-3471 |
Link |
Detailed Design |
Sha Tin |
Retrofitting of Noise Barriers on Tam Kon Shan Road, Tsing Yi (6858TH)
HyD e1nm.mw@hyd.gov.hk 2762-3347 |
Link |
Investigation |
Tsing Yi |
Retrofitting of Noise Barriers on New Clear Water Bay Road (6812TH)
HyD pc2nm.mw@hyd.gov.hk 2762-3617 |
Link |
Detailed Design |
Ngau Chi Wan (KPA 12) |
Retrofitting of Noise Barriers on Po Shek Wu Road (6833TH)
HyD pc2nm.mw@hyd.gov.hk 2762-3617 |
Link |
Detailed Design |
Fanling / Sheung Shui |
Upgrading of Deep Bay Road (6878TH)
HyD e1db.mw@hyd.gov.hk 2762-3634 |
Link |
Detailed Design |
Lau Fau Shan & Tsim Bei Tsui Ha Tsuen Fringe Sheung Pak Nai & Ha Pak Nai |
Site Formation and Infrastructure Works for Public Housing Development near Tan Kwai Tsuen, Yuen Long
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Tong Yan San Tsuen |
Site Formation and Infrastructure Works for Public Housing Development at Area 48, Fanling
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Fanling / Sheung Shui |
Site Formation and Infrastructure Works for Public Housing Development near Chai Wan Swimming Pool, Chai Wan
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Detailed Design |
Chai Wan (HPA 20) |
Site Formation and Infrastructure Works for Public Housing Development at A Kung Ngam Village, Eastern
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Detailed Design |
Shau Kei Wan |
Retrofitting of Noise Barriers on Chai Wan Road (6816TH)
HyD pc1nm.mw@hyd.gov.hk 2762-4262 |
Link |
Under study |
Chai Wan |
Extension Works to Lung Fu Road, Tuen Mun (6880TH & 6881TH)
HyD e2tmis.mw@hyd.gov.hk 2762-4129 |
Link |
Detailed Design |
Tuen Mun |
Site Formation and Infrastructure Works at Tin Wah Road, Lau Fau Shan
CEDD enquiry@cedd.gov.hk 2762-5111 |
Link |
Construction |
Lau Fau Shan & Tsim Bei Tsui |
Extension of Existing Footbridge No. KF90 across Lei Yue Mun Road near Tsui Ping Road and Proposed Road Works at Shing Yip Street, Kwun Tong, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Cha Kwo Ling, Yau Tong, Lei Yue Mun |
Proposed Road Works at Tai Lam Chung, Tuen Mun
LandsD landsd@landsd.gov.hk |
Link |
|
So Kwun Wat |
Proposed Road Works at Sung Hing Lane, Sai Ying Pun, Hong Kong
LandsD landsd@landsd.gov.hk |
Link |
|
Sai Ying Pun & Sheung Wan |
Proposed Road Works for Comprehensive Residential and Commercial Development Atop Siu Ho Wan Depot
LandsD landsd@landsd.gov.hk |
Link |
|
Tung Chung Extension Area |
Proposed Road Works at Wing Kwong Street, Sung On Street and Ngan Hon Street, To Kwa Wan, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Hung Hom |
Proposed Road Works at Po Fung Road, Tsuen Wan and Proposed Yau Kom Tau Residential Site
LandsD landsd@landsd.gov.hk |
Link |
|
Tsuen Wan |
Proposed Road Works at Hoi Tai Street, Quarry Bay Park Phase II, Island Eastern Corridor and Hoi Yu Street, Quarry Bay
LandsD landsd@landsd.gov.hk |
Link |
|
Quarry Bay |
Footbridge No. HF26 across Harcourt Road connecting Inland Lot No. 8286
LandsD landsd@landsd.gov.hk |
Link |
|
Central District (Extension) |
Proposed Road Works at Queen's Road West and In Ku Lane, Hong Kong
LandsD landsd@landsd.gov.hk |
Link |
|
Sai Ying Pun & Sheung Wan |
Proposed Road Works at Sai Yee Street, Argyle Street, Luen Wan Street and Hak Po Street, Mong Kok, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Mong Kok |
Proposed Pedestrian Subway at Queen's Road East
LandsD landsd@landsd.gov.hk |
Link |
|
Wan Chai |
Proposed Road Works at Kai Tak Road and Sa Po Road, Kowloon City, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Ma Tau Kok |
Proposed Road Works at Tung Chung Road and Proposed Cheung Sha Residential Site, Cheung Sha, Lantau Island
LandsD landsd@landsd.gov.hk |
Link |
|
South Lantau Coast |
Proposed Road Works at Clear Water Bay Road, Sai Kung and Proposed Ta Ku Ling Residential Site
LandsD landsd@landsd.gov.hk
|
Link |
|
Tseng Lan Shue |
Proposed Walkway Cover at Yun Ping Road and Kai Chiu Road and Proposed Covered Footbridges at Yun Ping Road, Sunning Road and Leighton Road, Causeway Bay
LandsD landsd@landsd.gov.hk |
Link |
|
Causeway Bay |
Proposed Footbridge Linking Hotel Development at No. 1 Cheong Tung Road in Hung Hom
LandsD landsd@landsd.gov.hk |
Link |
|
Hung Hom |
Upgrading Works of Pedestrian Subway No. KS61 At Salisbury Road, Tsim Sha Tsui, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Tsim Sha Tsui |
Proposed Road Works at To Kwa Wan Road, Kai Ming Street, Yuk Shing Street, Hung Fook Street, Ngan Hon Street and Wing Kwong Street, To Kwa Wan, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Hung Hom |
Proposed Road Works at Kim Shin Lane, Cheung Sha Wan, Kowloon
LandsD landsd@landsd.gov.hk |
Link |
|
Cheung Sha Wan
|
Proposed Road Improvement Works at Hoi Sha Path, Cheung Sha, Lantau Island
LandsD landsd@landsd.gov.hk |
Link |
|
South Lantau Coast |
Yuen Long South New Development Area - Second Phase Development
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Detailed Design |
Tong Yan San Tsuen Tai Tong |
Hung Shui Kiu/Ha Tsuen New Development Area Advance Works Phase 3 - Site Formation and Engineering Infrastructure
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Construction |
Hung Shui Kiu and Ha Tsuen |
Hung Shui Kiu/Ha Tsuen New Development Area Stage 2 Works - Site Formation and Engineering Infrastructure
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Construction |
Hung Shui Kiu and Ha Tsuen |
Development of San Tin Technopole Phase 1 Stage 1 works – site formation and engineering infrastructure
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Detailed Design |
San Tin Technopole |
The Establishment of an Agricultural Park in Kwu Tung South - Phase 2 First Stage
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Detailed Design |
Kwu Tung South |
Kwu Tung North / Fanling North New Development Areas (Remaining phase)
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Construction |
Kwu Tung North Fanling North
|
Improvement to So Kwun Po Interchange
CEDD enquiry@cedd.gov.hk 2762-5111
|
|
Detailed Design |
Fanling / Sheung Shui |
Improvement Works at Tai O - Phase 2, Stage 2
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Construction |
Sai Kung & Islands District |
Kwun Tong Town Centre Redevelopment – Provision of Grade-separated Pedestrian Linkages to the Kwun Tong Town Centre Redevelopment (Subway across Hong Ning Road at the junction with Ngau Tau Kok Road)
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Detailed Design |
Kwun Tong (South) (KPA 14 Pt.) |
Site Formation and Infrastructure Works for Public Housing Developments at Cheung Muk Tau
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Construction |
Ma On Shan |
Site Formation and Infrastructure Works for Public Housing Developments at San Hing Road and Hong Po Road, Tuen Mun
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Detailed Design |
Tuen Mun Lam Tei and Yick Yuen |
Site Formation and Infrastructure Works for Public Housing Development at Kwok Shui Road, Tsuen Wan (Road Works)
CEDD enquiry@cedd.gov.hk 2762-5111
|
Link |
Construction |
Kwai Chung Tsuen Wan
|
Widening of Tsuen Wan Road and the Associated Junction Improvement Works (6877TH)
HyD e2twr.mw@hyd.gov.hk 2762 4952
|
Link |
Investigation |
Kwai Chung Tsuen Wan |
Pedestrian Link near Chuk Yuen North Estate (6174TB)
HyD ephl2-2.wd@hyd.gov.hk 3903 6659
|
Link |
Detailed Design |
Tsz Wan Shan, Diamond Hill & San Po Kong (KPA 11)
|