Skip to main content

Traffic Notices

TRAFFIC ADVICE
Temporary Traffic Arrangement on Kennedy Road, Mid-levels

        Motorists are advised that to facilitate excavation works, the section of Kennedy Road between MacDonnell Road and Borrett Road will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic from 9.30 am to 3.00 pm daily on Mondays to Saturdays (except Public Holidays) between 10 February 2025 and 9 April 2025.

        Appropriate traffic signs will be provided on-site to guide motorists.

Sitemap Back to Top