Skip to main content

Traffic Notices

Traffic Advice
Temporary Traffic Arrangements on Tsing Sha Highway

          To facilitate road works, motorists are advised that the sections of Tsing Sha Highway (Kowloon bound) near the slip road leading to West Kowloon Highway westbound will implement temporary speed limit daily from 10.00 pm to 6.00 am of the following day during the period from 10 February 2025 to 15 March 2025 (except Sundays and public holidays). The speed limit of the above sections will be temporary adjusted from 80 kilometres per hour to 50 kilometres per hour.

          Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.

Sitemap Back to Top