Motorists are advised that, to facilitate the construction works for the Development of Lok Ma Chau Loop, 9 metered parking spaces (no. 24501A, 24501B, 24502A, 24502B, 24503A, 20504A, 24504B, 20505A and 24505B) at Lok Ma Chau Road near Lok Ma Chau Path, Yuen Long District will continue to be temporarily suspended from 4.00 p.m. on 31 December 2024 to 4.00 p.m. on 31 March 2025.
Appropriate traffic signs will be erected on site to guide motorists.