Traffic Advice
Extension of Temporary Traffic and Transport Arrangement on Man Tung Road, Tung Chung

          Members of the public are advised that to facilitate road works, the following temporary traffic and transport arrangement will continue to be implemented on Man Tung Road until 7 a.m. on 28 February 2025:-

(a) Lane Closure

          A section of slow lane of Man Tung Road eastbound from its junction with Kin Tung Road to a point about 60 meters east of the same junction will be closed to all vehicular traffic;

          A section of fast lane of Man Tung Road eastbound and westbound from its junction with Ying Hei Road to a point about 65 meters west of the same junction will be closed to all vehicular traffic; and

          A section of slow lane of Man Tung Road westbound from its junction with Hei Tung Street to a point about 40 meters west of the same junction will be closed to all vehicular traffic.

          Motorists could still make access to the remaining traffic lanes on Man Tung Road.

(b) Banning of Turning Movement

          All vehicles exceeding 7 meters in length will be prohibited from making left turn from the unnamed road westbound onto Man Tung Road westbound.

(c) Traffic Diversion

          Affected vehicles exceeding 7 meters in length on the unnamed road westbound heading to Man Tung Road westbound will be diverted via Man Tung Road eastbound, Ying Tung Road eastbound, roundabout, Ying Tung Road westbound and Hei Tung Street eastbound.

          Appropriate traffic signs have been erected on site to guide motorists.