Members of the public are advised that in order to facilitate the construction works of Development of Lok Ma Chau Loop, the following temporary traffic arrangements will be implemented from 2.00 p.m. on 21 October 2024 to 6.00 p.m. on 31 March 2025:
(I) Road Closure
Ha Wan Tsuen East Road from a point of about 560 metres north of its junction with Lok Ma Chau Road to a point of about 725 metres north of the same point will be temporarily closed.
(II) Traffic Diversion
Affected vehicles on Ha Wan Tsuen East Road heading for Lok Ma Chau Loop are advised to travel via Lok Ma Chau Road and unnamed road connecting Lok Ma Chau Loop.
Appropriate traffic signs will be set up on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.