Traffic Notices
Members of the public are advised that to facilitate the road works, the following traffic and transport arrangements will be temporarily implemented on Shek Kok Road, Tseung Kwan O:
1. Vehicles of length over 8 meters will be temporarily prohibited from making right turn from Shek Kok Road northbound near Manor Hill into Tseung Kwan O Preliminary Treatment Works from 10.00 a.m. on 11 March 2025 to 10.00 a.m. on 24 March 2025; and
Vehicles on Shek Kok Road northbound heading to Tseung Kwan O Water Treatment Works will be diverted via Shek Kok Road northbound, roundabout and Shek Kok Road southbound from 10.00 a.m. 11 March 2025 to 10.00 a.m. on 4 April 2025.
The GMB stand of N.T. GMB Route Nos. 112A and 112M at Shek Kok Road northbound near Manor Hill will be temporarily relocated northwards for about 11 meters from 10.00 a.m. on 4 April 2025 to 6.00 p.m. on 17 May 2025.
Appropriate traffic signs will be erected on site to guide motorists and road users. Public transport operator will display notice at the GMB stand to notify passengers of the above temporary arrangements.