Traffic Notices
Motorists are advised that to facilitate road works, the following temporary traffic arrangements will be implemented at the Tseung Kwan O Tunnel and Tseung Kwan O Tunnel Road in the following days:
Date |
Time |
Traffic Arrangement |
11 and 25 March 2025 | From 12.30 am to 5.00 am daily |
Tseung Kwan O Tunnel Tseung Kwan O bound tunnel tube and the slow lane of Tseung Kwan O Tunnel Road (Tseung Kwan O bound) will be temporarily closed One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube |
18 March and 1 April 2025 | From 12.30 am to 5.00 am daily |
Tseung Kwan O Tunnel Tseung Kwan O bound tunnel tube and the fast lane of Tseung Kwan O Tunnel Road (Tseung Kwan O bound) will be temporarily closed One-tube-two-way operation will be implemented at the Kwun Tong bound tunnel tube |
Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.