Traffic Notices
Traffic Advice
Extension of Temporary Traffic Arrangements on Tsing Sha Highway
To facilitate road works, motorists are advised that the sections of Tsing Sha Highway (Kowloon bound) near the slip road leading to West Kowloon Highway westbound will implement temporary speed limit daily from 10.00 pm to 6.00 am of the following day during the period from 16 March 2025 to 30 April 2025 (except Sundays and public holidays). The speed limit of the above sections will continue to be temporary adjusted from 80 kilometres per hour to 50 kilometres per hour.
Motorists are advised to drive with care and patience. Appropriate traffic signs will be provided on site to guide motorists.