Skip to main content

Traffic Notices

Traffic Advice
Temporary Traffic Arrangements on Fanling Highway


          Motorists are advised that in order to facilitate road works, the following road sections will be temporarily closed to all vehicular traffic from 1:00 a.m. to 5:30 a.m. daily on 6, 8, 18, 20, 22, 25 and 27 February 2025:

  1. The rightmost lane of Fanling Highway northbound from a point about 46 metres south of its junction with Heung Yuen Wai Highway near Kiu Tau Road to a point about 144 metres north of the same junction; and
  2. The two rightmost lanes of Fanling Highway northbound from a point about 144 metres north of its junction with Heung Yuen Wai Highway near Kiu Tau Road to a point about 1030 metres north of the same junction.
          Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.
Sitemap Back to Top