Traffic Advice
Traffic Arrangement at the Tseung Kwan O Tunnel

        Motorists are advised that to facilitate the regular cleansing, inspection and maintenance works at the Tseung Kwan O Tunnel, with effect from 1 June 2024 (Saturday), the following traffic arrangement will be implemented from 12.30 am to 6.00 am on every Tuesday and Friday (except public holidays) at the Tseung Kwan O Tunnel:

Day

Time

Tunnel Tube Closure

Traffic Arrangement

Every Tuesday

(except public holidays)

From 12.30 am to 6.00 am The Tseung Kwan O bound tunnel tube One-tube-two-way operation at the Kwun Tong bound tunnel tube

Every Friday

(except public holidays)

The Kwun Tong bound tunnel tube One-tube-two-way operation at the Tseung Kwan O bound tunnel tube


        The tunnel operator may revise the tunnel tube closure timetable according to its operational needs. Motorists are advised to drive with care and patience. Appropriate traffic signs will be erected on site to guide motorists.