Traffic Advice
Traffic Arrangements on Sai Sha Road, Tai Po


        Motorists are advised that to facilitate road widening works at Sai Sha Road, the following traffic arrangements will be implemented during the periods specified below:

(I)    From 12.30 am on 25 April 2024 onwards

The section of Sai Sha Road from its junction with the roundabout on Sai Sha Road near Sai O to its junction with the roundabout on Sai Sha Road near Ma Kwu Lam will be converted from single two-lane carriageway (i.e. two lanes in total for both bounds) to dual two-lane carriageway (i.e. four lanes in total for both bounds).

(II)   From 12.30 am on 30 April 2024 onwards

The section of Sai Sha Road from its junction with the roundabout on Sai Sha Road near Ma Kwu Lam to its junction with the roundabout on Sai Sha Road near Hoi Ying Road will be converted from single two-lane carriageway (i.e. two lanes in total for both bounds) to dual two-lane carriageway (i.e. four lanes in total for both bounds).

        Appropriate traffic signs will be provided on site to guide motorists.