Traffic Notices
Transport Department Notice
Temporary Traffic Arrangements on Fanling Station Road, North District
Notice is hereby given that to facilitate the covered walkway construction works, the following temporary traffic arrangements will be implemented at Fanling Station Road from 05.30 am on 27 March 2021 to 05.30 am on 31 December 2021 as specified below:
(I) TRAFFIC AND TRANSPORT ARRANGEMENTS
The details of bus stop relocation arrangement are as follows:
Route |
Bus Stop |
Relocation Arrangement |
KMB route no. 79K |
Fanling Station Road near Fanling Station Playground |
Relocated to 3 meters north of original stop |
KMB will display notices at the stop to advise passengers of the above temporary transport arrangement.
(II) CYCLIST AND PEDESTRIAN ARRANGEMENTS
1. A section of cycle track in front of Fanling Station Playground will be temporarily suspended and converted into footpath; and
2. The existing footpath in front of Fanling Station Playground will be temporarily suspended.
Appropriate signs will be erected on site to guide affected cyclists and pedestrians. Motorists are advised to drive with utmost care and patience.
LAW Shuk-pui, Rosanna Commissioner for Transport