Section 4Road Tunnels and Control Areas
Traffic Statistics - Cheung Shan Tunnel
Year | Traffic (Vehicles) | |||
---|---|---|---|---|
Southbound | Northbound | Total | Daily Average | |
2019 | 333,969 | 328,125 | 662,094 | 3,010 |
2020 | 540,048 | 576,621 | 1,116,669 | 3,181 |
Note: | The Cheung Shan Tunnel was commissioned on 26 May 2019. Due to the malfunction of the vehicle detection system which is used for vehicle counting at Cheung Shan Tunnel during some period in 2020, the traffic figures for the affected days are excluded. |
---|