Section 4Road Tunnels and Control Areas
Complaints received by the Transport Department
2018 | 2019 | 2020 | |
---|---|---|---|
Lion Rock Tunnel | 28 | 14 | 2 |
Aberdeen Tunnel | 19 | 27 | 11 |
Kai Tak Tunnel | 14 | 6 | 8 |
Shing Mun Tunnels | 12 | 15 | 13 |
Tseung Kwan O Tunnel | 10 | 11 | 23 |
Cross-Harbour Tunnel | 35 | 53 | 19 |
Eastern Harbour Crossing | 46 | 24 | 24 |
Western Harbour Crossing | 8 | 15 | 5 |
Tate's Cairn Tunnel | 21 | 13 | 14 |
Tai Lam Tunnel | 11 | 17 | 10 |
Tsing Ma Control Area | 64 | 43 | 30 |
Tsing Sha Control Area | 29 | 15 | 12 |
Scenic Hill Tunnel | 1 | 1 | 4 |
Airport Tunnel | 0 | 0 | |
Central-Wan Chai Bypass Tunnel | / | 10 | 14 |
Lung Shan Tunnel and Cheung Shan Tunnel | / | 4 | 10 |
Tuen Mun-Chek Lap Kok Tunnel | / | / | 1 |
General | 1 | 11 | 1 |
Total | 299 | 279 | 201 |
Note: |
Airport Tunnel was commissioned on 24 October 2018. Scenic Hill Tunnel was commissioned on 24 October 2018. The Central-Wan Chai Bypass Tunnel was commissioned on 20 January 2019. The Lung Shan Tunnel and Cheung Shan Tunnel were commissioned on 26 May 2019. The Tuen Mun-Chek Lap Kok Tunnel was commissioned on 27 December 2020. |
---|