Section 4Road Tunnels and Control Areas

Complaints received by the Transport Department

  2018 2019 2020
Lion Rock Tunnel 28 14 2
Aberdeen Tunnel 19 27 11
Kai Tak Tunnel 14 6 8
Shing Mun Tunnels 12 15 13
Tseung Kwan O Tunnel 10 11 23
Cross-Harbour Tunnel 35 53 19
Eastern Harbour Crossing 46 24 24
Western Harbour Crossing 8 15 5
Tate's Cairn Tunnel 21 13 14
Tai Lam Tunnel 11 17 10
Tsing Ma Control Area 64 43 30
Tsing Sha Control Area 29 15 12
Scenic Hill Tunnel 1 1 4
Airport Tunnel 0 0
Central-Wan Chai Bypass Tunnel / 10 14
Lung Shan Tunnel and Cheung Shan Tunnel / 4 10
Tuen Mun-Chek Lap Kok Tunnel / / 1
General 1 11 1
Total 299 279 201
Note:

Airport Tunnel was commissioned on 24 October 2018.

Scenic Hill Tunnel was commissioned on 24 October 2018.

The Central-Wan Chai Bypass Tunnel was commissioned on 20 January 2019.

The Lung Shan Tunnel and Cheung Shan Tunnel were commissioned on 26 May 2019.

The Tuen Mun-Chek Lap Kok Tunnel was commissioned on 27 December 2020.