Print

Traffic Statistics - Eagle's Nest Tunnel and Sha Tin Heights Tunnel

Year Traffic (Vehicles)
Southbound Northbound Total Daily Average
2012 7,123,708 7,358,428 14,482,136 39,569
2013 7,666,793 7,954,186 15,620,979 42,797
2014 8,327,237 8,649,834 16,977,071 46,513
2015 8,936,319 9,365,148 18,301,467 50,141
2016 9,774,936 10,105,031 19,879,967 54,317
2017 10,305,854 10,649,639 20,955,493 57,412
2018 10,833,292 11,121,339 21,954,631 60,150
2019 11,142,326 11,356,381 22,498,707 61,640
2020 9,789,604 10,184,012 19,973,616 54,573
2021 10,824,550 11,347,939 22,172,489 60,747
Note:
The Eagle's Nest Tunnel and Sha Tin Heights Tunnel were open to traffic on 21 March 2008. The Eagle's Nest Tunnel and Sha Tin Heights Tunnel are connected by the toll plaza between them and cannot be used separately, so the traffic figures are the same.