Traffic Notices
Traffic Advice
Temporary Traffic Arrangements on Ching Cheung Road, Kwai Chung
Motorists are advised that to facilitate gas valve maintenance works, the following temporary traffic arrangements will be implemented on Ching Cheung Road, Kwai Chung from 9.00 a.m. to 5.00 p.m. on 13 and 27 April 2025:
(I) Road ClosureThe slip road of Ching Cheung Road (westbound) leading to Container Port Road South (southbound) will be temporarily closed to all vehicular traffic.
(II) Traffic DiversionAffected vehicles on Ching Cheung Road (westbound) heading for Container Port Road South (southbound) will be diverted to travel via Roundabout No. 5 at Container Port Road South.
Appropriate traffic signs will be erected on site to guide motorists.