Members of the public are advised that, to facilitate drainage works, Ping Che Road from a point about 365 metres south of its junction with Lin Ma Hang Road to a point about 475 metres south of the same junction (near Ping Yuen River) will be temporarily converted to one-lane two-way traffic on two days between 30 December 2024 (Monday) and 31 January 2025 (Friday) from 12 a.m. to 6 a.m..
Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.