Motorists are advised that, to facilitate the road work, the section of San Kung Street from a point about 25 metres west of its junction with San Shing Avenue to a point about 45 metres west of the same junction will be temporary closed from 10 a.m. on 13 January 2025 (Monday) to 6 p.m. on 20 January 2025 (Monday). Affected vehicles will be diverted via the general layby on San Kung Street from San Shing Avenue to San Hong Street.
Appropriate traffic signs and road markings will be erected on site to guide motorists.