TRAFFIC ADVICE
Temporary Traffic and Transport Arrangements on Kwun Tong Road and
Hip Wo Street, Kwun Tong
Members of public are advised that to facilitate footbridge construction works, the following temporary traffic and transport arrangements will be implemented from 0.00 a.m. to 5.30 a.m. on 15, 19, 22 and 29 December 2024.
(1) Lane Closure
The following road sections will be temporarily closed to all vehicular traffic:
(a) The slow lane of Hip Wo Street southbound from its junction with Kwun Tong Road to a point about 110 metres north of the same junction; and
(b) The slow lane of Kwun Tong Road eastbound from its junction with Hip Wo Street to a point about 120 metres east of the same junction.
(2) Closure of Footway
The following footway will be temporarily closed to all pedestrians:
(a) A section of the footway of about 110 metres near Kwun Tong Road / Hip Wo Street Rest Garden on Hip Wo Street; and
(b) A section of the footway of about 120 metres near Kwun Tong Road / Hip Wo Street Rest Garden on Kwun Tong Road.
(3) Pedestrian Diversion
Affected pedestrian will be diverted via Tung Yan Street, the elevated walkway connecting Exit C of MTR Kwun Tong Station, Kwun Tong Road / Hip Wo Street Rest Garden and the elevated walkway connecting Exit D of MTR Kwun Tong Station.
(4) Public Transport Arrangements
The bus stop on Kwun Tong Road eastbound outside Kwun Tong Station for KMB Route Nos. 15A and 98A will be temporarily relocated about 10 metres eastward.
Notice / on-site signage will be displayed by public transport operator / works contractor to advise public of the above arrangement.