Motorists are advised that in order to facilitate road works, a section of the fast lane of Yu Tung Road northbound from a point about 100 meters north of its junction with Shun Tung Road to a point about 170 meters north of the same junction will be temporarily closed to all vehicular traffic from 10.00 a.m. to 4.00 p.m. daily from 2 January 2025 to 24 January 2025. During the lane closure, motorists can use the slow lane of the above road section.
Appropriate traffic signs will be erected on site to guide motorists.