Traffic Advice
Temporary Traffic Arrangements at Ta Chuen Ping Street, Kwai Chung
Members of the public are advised that to facilitate road works, the following temporary traffic arrangements at Ta Chuen Ping Street will be implemented from 6.01 pm on 27 November 2024 to 6.00 pm on 18 January 2025:
(I) Lane Closure
- The left lane of Ta Chuen Ping Street from a point about 43 metres west of its junction with Chun Pin Street to a point about 82 meters west of the same junction will be temporarily closed to all vehicular traffic; and
- The left lane of Ta Chuen Ping Street from a point about 128 metres west of its junction with Chun Pin Street to a point about 190 meters west of the same junction, will be temporarily closed to all vehicular traffic.
(II) Suspension of Overnight Goods Vehicle Parking Spaces
- The overnight goods vehicle parking spaces on the western kerbside lane of Tai Chuen Ping Street from a point about 180 metres north of its western junction with Wo Yi Hop Road to a point about 205 metres north of the same junction will be suspended.
Appropriate traffic signs will be erected on site to guide motorists.