Motorists are advised that to facilitate drainage works, the slow lane of Cha Kwo Ling Road westbound from a point about 100 metres east of its junction with Yau Tong Road to a point about 360 metres east of the same junction will continue to be temporarily closed to all vehicular traffic from 6.00 pm on 30 November 2024 to 6.00 pm on 28 February 2025.
Appropriate traffic signs have been erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care.