Motorists are advised that to facilitate filming works, the section of slip road leading from Chong San Road to Pak Shek Kok Sewage Pumping Station No.3 from its cul-de-sac to a point about 75 meters east of the same cul-de-sac will be temporarily closed from 9.00 pm on 23 November 2024 to 1.00 am on 24 November 2024.
Appropriate traffic signs will be provided on site to guide motorists.