Traffic Advice
Temporary Traffic Arrangements on Sha Tau Kok Road - Shek Chung Au and Shun Hing Street, North District


          Members of the public are advised that in order to facilitate drainage works, the following road sections will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic from 10.00 pm to 6.00 am of the following day daily between 15 November 2024 and 31 December 2024 (except Sundays and Public Holidays):

  1. Sha Tau Kok Road – Shek Chung Au from a point about 20 metres west of its western junction with Shun Hing Street to a point about 50 metres east of the same junction; and
  2. Shun Hing Street from its western junction with Sha Tau Kok Road – Shek Chung Au to a point about 40 metres north of the same junction.

          Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive in utmost care.