TRAFFIC ADVICE
Temporary Traffic and Transport Arrangements on Kwun Tong Road and
Hip Wo Street, Kwun Tong


       Members of public are advised that to facilitate footbridge construction works, the following temporary traffic
and transport arrangements will be implemented from 0.00 a.m. to 5.30 a.m. daily on Thursdays and Sundays during the period from 10 November 2024 to 12 December 2024.


(1)    Lane Closure

The following road sections will be temporarily closed to all vehicular traffic:

(a)    The slow lane of Hip Wo Street southbound from its junction with Kwun Tong Road to a point about 110 metres north of the same junction;
and

(b)    The slow lane of Kwun Tong Road eastbound from its junction with Hip Wo Street to a point about 120 metres east of the same junction.

(2)    Closure of Footway

The following footway will be temporarily closed to all pedestrians:

(a)    A section of the footway of about 110 metres near Kwun Tong Road / Hip Wo Street Rest Garden on Hip Wo Street; and

(b)    A section of the footway of about 120 metres near Kwun Tong Road / Hip Wo Street Rest Garden on Kwun Tong Road.

(3)    Pedestrian Diversion

Affected pedestrian will be diverted via Tung Yan Street, the elevated walkway connecting Exit C of MTR Kwun Tong Station, Kwun Tong Road / Hip Wo Street Rest Garden and the elevated walkway connecting Exit D of MTR Kwun Tong Station.

(4)    Public Transport Arrangements

The bus stop on Kwun Tong Road eastbound outside Kwun Tong Station for KMB Route Nos. 15A and 98A will be temporarily relocated about 10 metres eastward.


       Notice / on-site signage will be displayed by public transport operator / works contractor to advise public of the above arrangement.