TRAFFIC ADVICE
Temporary Traffic and Transport Arrangements on Kwun Tong Road, Kwun Tong
Motorists are advised that to facilitate construction works, the following temporary traffic and transport arrangements will be implemented on Kwun Tong Road from 12.00 midnight to 5.30 am on every Thursday and Sunday during the period from 9 November 2024 to 12 December 2024:-
1. Lane Closure
The following road sections will be temporarily closed to all vehicular traffic:-
(i) The slow lane of about 70 metres on Kwun Tong Road southbound near Chit Wong Mansion; and
(ii) The slow lane of about 50 metres on Kwun Tong Road southbound near Ting Fu Street.
2. Public Transport Arrangement
The GMB stop for New Territories GMB Route Nos. 102 and 102S on Kwun Tong Road southbound near Ting Fu Street will be temporarily relocated about 60 metres eastwards.
Appropriate traffic signs have been erected on site to guide motorists. The public transport operators will display notices to advise passengers of the above temporary arrangements.