TRAFFIC ADVICE
Temporary Traffic Arrangement on Kwun Tong Road, Kwun Tong


       Motorists are advised that to facilitate footbridge works, either the road sections in (i) or (ii) below will be temporarily closed to all vehicular traffic from 10.00 am to 4.00 pm on every Tuesday to Friday between the period from 22 October 2024 to 17 January 2025:-


(i)     A section of fast lane of about 210 metres on Kwun Tong Road northbound near Kowloon Bay MTR Station Exit A and a section of fast lane of about 210 metres on Kwun Tong Road southbound near Lower Ngau Tau Kok Estate; or

(ii)    A section of fast lane of about 240 metres on Kwun Tong Road northbound near Kowloon Bay MTR Station Exit A and a section of fast lane of about 320 metres on Kwun Tong Road southbound near Ngau Tau Kok Park.


       Appropriate traffic signs will be erected on site to guide motorists.