Transport Department Notice
Temporary Traffic Arrangements on North Lantau Highway

          Motorists are advised that in order to facilitate the works of Tung Chung New Town Extension – Tai Ho Interchange, the following temporary traffic arrangements on North Lantau Highway will be implemented from 10 am on 14 September 2024 to 4 pm on 13 December 2024:-

  1. A section of fast lane of North Lantau Highway eastbound from a point about 790 metres east of its junction with the slip road leading to Shun Long Road eastbound to a point about 1990 metres east of the same junction will be temporarily closed to all vehicular traffic; and
  2. A section of fast lane of North Lantau Highway westbound from its junction with the slip road leading to Shun Long Road westbound to a point about 1200 metres west of the same junction will be temporarily closed to all vehicular traffic.

          During the above lane closure, motorists can use the remaining lanes of the above road section.

          Appropriate traffic signs will be erected on site to guide motorists.

HO Kwong-hang, Patrick Commissioner for Transport (Acting)