TRAFFIC ADVICE
Temporary Traffic Arrangements on Shung Shun Street, Yau Tong


        Motorists are advised that to facilitate road reinstatement works, the following temporary trafficarrangements will be implemented in Yau Tong from 8.00 am on 8 July 2024 to 6.00 pm on 20 July 2024.


(1)     Traffic Arrangements

The section of Shung Shun Street from its cul-de-sac to a point about 30 metres north of the cul-de-sac will be temporarily converted from two-lane two-way traffic into one-lane two-way traffic.

(2)     Suspension of Parking Spaces

1 metered parking space for coaches (No. 12681B) on Shung Shun Street near Sam Ka Tsuen Ferry Pier will be suspended.


        Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to observe the instruction and drive with utmost care.