Traffic Advice
Temporary Traffic Arrangements on Liu To Road and Tsing Yi Road West, Tsing Yi


Motorists are advised that due to rescheduling of works, temporary traffic arrangements on Liu To Road and Tsing Yi Road West originally scheduled on 27 June 2024 will be postponed to 10 July 2024. Temporary traffic arrangements on Liu To Road and Tsing Yi Road West will be implemented from 9.00 p.m. on 10 July 2024 to 5.30 a.m. of the following day:

(I)    Lane Closure

The following traffic lanes will be closed to all vehicular traffic:

    1. The section of Liu To Road southbound from its junction with Tsing Yi Road West to a point about 75 metres north of the same junction;
    2. The slow lane of Liu To Road northbound from its junction with Tsing Yi Road West to a point about 75 metres north of the same junction;
    3. The slow lane of Tsing Yi Road West northbound from its junction with Liu To Road to a point about 55 metres south of the same junction;
    4. The section of Tsing Yi Road West northbound from its junction with Liu To Road to a point about 85 metres north of the same junction;
    5. The fast lane of Tsing Yi Road West southbound from its junction with Liu To Road to a point about 115 metres north of the same junction; and
    6. The middle lane of Tsing Yi Road West southbound from its junction with Liu To Road to a point about 50 metres north of the same junction.
(II)    Lane Conversion

    1. The fast lane of Liu To Road northbound from its junction with Tsing Yi Road West to a point about 75 metres north of the same junction will be temporarily converted into one-lane-two-way traffic; and
    2. The slow lane of Tsing Yi Road West southbound from its junction with Liu To Road to a point about 50 metres north of the same junction will be temporarily converted into one-lane-two-way traffic.

Appropriate traffic signs will be erected on site to guide motorists.