Traffic Advice
Temporary Traffic Arrangement on Fanling Highway, North District

Motorists are advised that, to facilitate road works at Fanling Highway, a section of about 2.3 kilmetres of the middle and fast lane of Fanling Highway (Southbound) from a point outside Kam Tsin Village Ho Tung School to a point outside Yuk Po Court Chow Wu House will be temporarily closed to all vehicular traffic from 12.00 am to 5.30 am daily on Mondays to Fridays (except public holidays) from 3 July 2024 (Wednesday) to 23 August 2024 (Friday), while the slow lane will not be affected.

Appropriate traffic signs will be erected on site to guide motorists. Motorists are advised to drive with utmost care and patience.