Members of the public are advised that, to facilitate drainage works, Ping Che Road from a point about 60 metres north of its junction with Ping Yuen Road to a point about 200 metres north of the same junction will continue to be temporarily converted to one-lane two-way traffic from 4 p.m. on 25 May 2024 (Saturday) to 4 p.m. on 25 November 2024 (Monday).
Appropriate traffic signs will continue to be erected on site to guide motorists. Motorists are advised to follow the instructions on site and drive with utmost care.