Motorists are advised that to facilitate road works, the following road sections will be temporarily closed to all vehicular traffic:-
|
Implementation Period |
Lane Closure |
|
From 11.00 pm to 5.30 am of the following day daily during the period from 18 to 23 December 2023 |
The slow lane of about 300 metres on the elevated section of Lung Cheung Road eastbound near Ngau Chi Wan Municipal Services Building. |
|
From 11.00 pm to 5.30 am of the following day daily during the period from 8 to 13 January 2024 |
The slow lane of about 530 metres on the elevated section of Lung Cheung Road westbound near Ping Shek Estate. |
Appropriate traffic signs will be erected on site to guide motorists.