Traffic Advice
Temporary Traffic Arrangements on On Lai Street, Sha Tin

        Motorists are advised that in order to facilitate gas works, the following temporary traffic arrangements will be implemented in Sha Tin from 10.00 am to 4.00 pm daily between 29 July 2024 and 3 August 2024:

A.      Lane Closure

A section of the fast lane of On Lai Street (west bound) from a point about 5 meters east of its junction with Tai Chung Kiu Road to a point about 60 meters east of the same junction will be temporarily closed to all vehicular traffic.

B.      Traffic Diversion

    1. Vehicles from the carpark exit at On Lai Street (east bound) heading to On Lai Street (west bound) will be diverted via On Lai Street (east bound), On Ping Street (north bound), On Sum Street (east bound), On Sum Street (south bound) and On Lai Street (west bound).
    2. Vehicles on On Lai Street (west bound) heading to the carpark entrance at On Lai Street (east bound) will be diverted via On Ping Street (north bound), On Sum Street (west bound), Tai Chung Kiu Road (south bound) and On Lai Street (east bound).

        Appropriate traffic signs will be erected on site to guide motorists.